GEGN8577 Iss 1
Guidance on the Application of Selective Door Operation Systems
Synopsis
This document is intended to assist railway undertakings and infrastructure managers in selecting and implementing Selective Door Operation (SDO) systems appropriate for specific applications. The factors which determine the level of functionality of SDO systems appropriate to a particular application are also considered.
Read full standard

Registered
Withdrawn
Guidance Note
- Issued:
- 01/04/2008
- Published:
- 05/04/2008
- In Force:
- 05/04/2008
- Withdrawn:
- 05/06/2010
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Superseded By | GEGN8577 Iss 2 |
Lead Committee | Rolling Stock - RST |
Supporting Committee | Control Command and Signalling - CCS; Plant - PLT |
Briefing Notes | 08 BN14; 10 BN18 |