Menu

GEGN8644 Iss 1

Guidance on Safety Requirements and Hazard Management

Synopsis

This document gives practitioner level guidance on the application of the risk management process set out in the 'Common Safety Method on Risk Evaluation and Assessment' (CSM RA). Specifically, this guidance is intended to assist infrastructure managers (IMs) and railway undertakings (RUs) when applying the CSM RA to formulate safety requirements, comply with them, demonstrate compliance and manage hazards.

Summary Of Changes

Replaced by new guidance which combines guidance on the CSM RA into a single reference volume.
Read full standard
register-icon
Registered
Withdrawn
Guidance Note
Issued:
07/06/2014
Published:
07/06/2014
In Force:
07/06/2014
Withdrawn:
02/12/2017

Details

Consultation Status Closed
Vehicle Assessment Yes
Lead Committee Control Command and Signalling - CCS; Energy - ENE; Infrastructure - INS; Plant - PLT; Rolling Stock - RST; Traffic Operation and Management - TOM
Briefing Notes 14 BN09; 17 BN26