GERT8000-HB11 Iss 8
Duties of the person in charge of the possession (PICOP)
Synopsis
You will need this handbook if you carry out the duties of the PICOP.
Summary Of Changes
Section 4.2 has been revised to facilitate the introduction of the flexible train arrival point (FTAP) into the Rule Book.
Section 12.1 has been revised to include arrangements for giving up a work site with an engineering train or on-track machine standing within it. The changes are intended to allow work to be undertaken for a greater proportion of the available time within a possession.
Read full standard

Registered
Withdrawn
Rule Book Handbook
- Issued:
- 05/09/2020
- Published:
- 05/09/2020
- In Force:
- 05/12/2020
- Withdrawn:
- 04/12/2021
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-HB11 Iss 7 |
Superseded By | GERT8000-HB11 Iss 9 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS; Plant - PLT |
Impact Assessments
![]() Registered |
20 IA13 |
Supporting Documents | GERT8000-Issue HB Iss 12 ; GERT8000-RBBL Iss 34 |
Deviations
![]() Registered |
20-051-DEV
Granting possessions. |