GERT8000-HB11 Iss 7
Duties of the person in charge of possession (PICOP)
Synopsis
You will need this handbook if you carry out the duties of the PICOP.
Summary Of Changes
Diagram HB11.2 has been amended to clearly identify which points are referred to. Additional instructions at clause 6.2 to reproduce the ability in GERT8000-HB12, section 3.4, to place work-site marker boards at reduced distances. Additional instruction and title change at clause 8.12 to mirror section 4.5 of GERT8000-T3 and refer to any movement made towards detonator protection placed at less than the standard distance from points or crossings.
Read full standard

Registered
Withdrawn
Rule Book Handbook
- Issued:
- 07/09/2019
- Published:
- 07/09/2019
- In Force:
- 07/12/2019
- Withdrawn:
- 05/12/2020
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-HB11 Iss 6 |
Superseded By | GERT8000-HB11 Iss 8 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS; Plant - PLT |
Impact Assessments
![]() Registered |
19 IA11 |
Supporting Documents | GERT8000-RBBL Iss 33 ; GERT8000-Issue HB Iss 11 |
Deviations
![]() Registered |
19-009-DEV_Revised_01-07-2020
Network Rail High Output Train: Flexible Train Arrival Point (FTAP). |