GERT8000-HB11 Iss 7

Duties of the person in charge of possession (PICOP)

Synopsis

You will need this handbook if you carry out the duties of the PICOP.

Summary Of Changes

Diagram HB11.2 has been amended to clearly identify which points are referred to. Additional instructions at clause 6.2 to reproduce the ability in GERT8000-HB12, section 3.4, to place work-site marker boards at reduced distances. Additional instruction and title change at clause 8.12 to mirror section 4.5 of GERT8000-T3 and refer to any movement made towards detonator protection placed at less than the standard distance from points or crossings.
Read full standard
register-icon
Registered
Withdrawn
Rule Book Handbook
Issued:
07/09/2019
Published:
07/09/2019
In Force:
07/12/2019
Withdrawn:
05/12/2020

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GERT8000-HB11 Iss 6
Superseded By GERT8000-HB11 Iss 8
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Control Command and Signalling - CCS; Plant - PLT
Impact Assessments
register-icon
Registered
19 IA11
Supporting Documents GERT8000-RBBL Iss 33 ; GERT8000-Issue HB Iss 11
Deviations
register-icon
Registered
19-009-DEV_Revised_01-07-2020

Network Rail High Output Train: Flexible Train Arrival Point (FTAP).