GERT8000-HB12 Iss 8
Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession
Synopsis
Summary Of Changes
Section 3.2 has been revised to facilitate the introduction of the flexible train arrival point (FTAP) into the Rule Book. Section 10.3 has been revised to include arrangements for giving up a work site with an engineering train or on-track machine standing within it. The changes are intended to allow work to be undertaken for a greater proportion of the available time within a possession. A new section 11 has been added to facilitate the introduction of high output protection zones into the Rule Book. The introduction of high output protection zones into the Rule Book is intended to improve track worker safety by removing the need for possession support staff to go trackside to place standard possession protection, and to result in improved productivity on each occasion that a high output train is used.
Optional reading and resources:
RED 25 - SPADs and Possessions Irregularities

- Issued:
- 05/09/2020
- Published:
- 05/09/2020
- In Force:
- 05/12/2020
- Withdrawn:
- 03/12/2022
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-HB12 Iss 7 |
Superseded By | GERT8000-HB12 Iss 9 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS; Plant - PLT |
Impact Assessments
![]() Registered |
20 IA13 |
Supporting Documents | GERT8000-Issue HB Iss 12 ; GERT8000-RBBL Iss 34 |
Deviations
![]() Registered |
22-013-DEV
Use of EPR as an additional protection in line blockage
21-054-DEV
Birmingham New Street station area: Requirement to work within 100 metres of the Work. Site Marker Boards (WSMB) where there is no more than a 10mph permissible speed limit.
21-054-DEV Revised 14-04-2022 and 06-10-2022
Birmingham New Street station area: Requirement to work within 100 metres of the Work Site Marker Boards (WSMB) where there is no more than a 10 mph permissible speed limit. |