GERT8000-T11 ERTMS Iss 1
Movement of engineering trains and on-track plant under T3 ERTMS arrangements
Synopsis
Rule Book module GERT8000-T11 ERTMS sets out the requirements for signallers, a person in charge of possession (PICOP), engineering supervisor, driver / operator of an engineering train or OTM, shunter and a person in charge of movements, unloading and loading of rail vehicles within a T3 ERTMS possession. These rules are specifically for use during the ERTMS pilot on the Cambrian Lines. The implementation date for these rules will be advised locally.
Read full standard
![register-icon](/-/media/Themes/RSSB/RssbWebsite/Default/images/icons/register-icon.png)
Registered
Withdrawn
Rule Book Modules:
ERTMS
- Issued:
- 01/10/2009
- Published:
- 03/10/2009
- In Force:
- 03/10/2009
- Withdrawn:
- 01/06/2013
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS |
Briefing Notes | 09 BN21 |
Amendments
![]() Registered |
8000-T11 ERTMS Iss 1 AM001 |