Menu

GERT8000-T1B Iss 2

T1B - Working of trains during failure, maintenance and renewal of signalling equipment.

Synopsis

Rule Book module GERT8000-T1B sets out the requirements for signallers and operations control when making arrangements for the movement of trains during the time the signalling equipment is not fully operative. The reissue of T1B is the conclusion of a thorough review of the instructions for signallers maintaining train movements during the time signalling equipment cannot be operated because it has failed or it is being maintained.
Read full standard
register-icon
Registered
Withdrawn
Rule Book Modules: Track and signalling work (T)
Issued:
01/10/2007
Published:
06/10/2007
In Force:
01/12/2007
Withdrawn:
05/06/2010

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GERT8000-T1B Iss 1
Superseded By GERT8000-T1B Iss 3
Lead Committee Traffic Operation and Management - TOM