GERT8000-T3 Iss 2
Possession of the line for engineering work
Synopsis
Rule Book module GERT8000-T3 sets out the requirements for signallers, person in charge of a possession (PICOP) and engineering supervisor in making the arrangements for a possession of the line for engineering work.
Read full standard

Registered
Withdrawn
Rule Book Modules:
Track and signalling work (T)
- Issued:
- 01/01/2007
- Published:
- 06/01/2007
- In Force:
- 02/06/2007
- Withdrawn:
- 04/06/2011
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-T3 Iss 1 |
Superseded By | GERT8000-T3 Iss 3, GERT8000-HB11 Iss 1, GERT8000-HB12 Iss 1 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS |
Impact Assessments
![]() Registered |
11 EOC01 |
Deviations
![]() Registered |
07-107-NC
Possession of the line for engineering work (Tracker No 4863)
09-181-TNC
Proposed pilot of the Track Occupancy Permit (TOP) system.
07-167-TNC
Possession of the line for engineering work (Tracker No 4974)
08-056-TNC
Possession of the line for engineering work (Tracker No 5340)
08-126-TNC
T3 possession trials without using detonators or possession limit boards.
10-027-TNC
Possessions times |