GERT8000-T4 Iss 2
Possession of a siding for engineering work
Synopsis
Rule Book module GERT8000-T4 sets out the requirements for signallers or ground frame operator, person in charge of a siding and a person in charge of a T4 possession in making the arrangements for the possession of a siding. It also contains instructions when OTP is being on or off tracked in a siding.
Read full standard

Registered
Withdrawn
Rule Book Modules:
Track and signalling work (T)
- Issued:
- 01/10/2006
- Published:
- 07/10/2006
- In Force:
- 02/12/2006
- Withdrawn:
- 04/06/2011
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-T4 Iss 1 |
Superseded By | GERT8000-HB13 Iss 1 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Plant - PLT |
Impact Assessments
![]() Registered |
11 EOC01 |