GERT8000-T5 Iss 1
T5 - Operating power-operated points by hand
Synopsis
Rule Book module GERT8000-T5 sets out the requirements for signallers, point operators and agent in the operation of power-operated point by hand that cannot be used normally because of a failure.
Read full standard

Registered
Withdrawn
Rule Book Modules:
Track and signalling work (T)
- Issued:
- 01/06/2003
- Published:
- 07/06/2003
- In Force:
- 06/12/2003
- Withdrawn:
- 05/06/2010
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Superseded By | GERT8000-TS5 Iss 2 |
Lead Committee | Traffic Operation and Management - TOM |