GERT8000-TS11 Iss 3
Failure of, or work on, signalling equipment - signallers' regulations
Synopsis
You will need this module if you carry out the duties of a signaller.
Summary Of Changes
Changes to support the national rollout of European Railway Traffic Management System (ERTMS) on the GB mainline network:
- New instruction on trains approaching a missing block marker.
- New instruction on dealing with a train where trackside equipment failure prevents a level 1 launch.
- New instruction on resuming normal working after inability to issue an MA and train instructed to proceed on lineside signals.
- Correction of wrong cross reference previously published in PON.
Read full standard

Registered
Withdrawn
Rule Book Modules:
Train signalling (TS)
- Issued:
- 02/09/2017
- Published:
- 02/09/2017
- In Force:
- 02/12/2017
- Withdrawn:
- 01/06/2019
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-TS11 Iss 2 |
Superseded By | GERT8000-TS11 Iss 3.1 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS |
Impact Assessments
![]() Registered |
17 IA13 |
Supporting Documents | GERT8000-RBBL Iss 30 |