GERT8000-TW3 Iss 2
Preparation and movement of locomotive hauled trains (including HSTs, push-pull, postal, parcels)
Synopsis

- Issued:
- 01/11/2004
- Published:
- 08/11/2004
- In Force:
- 05/02/2005
- Withdrawn:
- 07/12/2013
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-TW3 Iss 1 |
Superseded By | GERT8000-TW1 Iss 9, GERT8000-TW5 Iss 4 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Rolling Stock - RST |
Impact Assessments
![]() Registered |
13 EOC05 |
Deviations
![]() Registered |
06-093-DGN
Preparation and movement of locomotive hauled trains
08-236-DGN
Brake Continuity Test Requirement
09-113-TNC
Working a freight train with more than three consecutive vehicles with the brakes isolated.
09-144-TNC
Conveyance of New Bombardier LUL ‘S’ Stock
08-070-TNC
Permissible Line Speeds for Class 67 Locomotives running light or hauling one, two or three vehicles
08-071-TNC
Alternative measures for the function of a brake van for top & tailed passenger loco-hauled trains.
08-195-TNC
Conveyance of New Bombardier LUL ‘S’ Stock
05-047-TNC
Working trains with locomotives at both ends
10-065-TNC
Working a freight train with more than three consecutive vehicles with the brakes isolated.
10-062-TNC
Conveyance of New Bombardier LUL ‘S’ Stock
10-150-TNC
Maximum speed of Class 67s running light locomotive
10-191-DGN
Alternative measures for the function of a brake van for top & tailed passenger loco-hauled trains.
10-192-DGN
Alternative measures for the function of a brake van for top & tailed passenger loco-hauled trains.
11-169-DGN
Class 67 Running Light Engine & Hauling Short Trains at Permissible Speeds
12-025-DGN
Class 67 Running Light Engine and Hauling Short Trains at Permissible Speeds
11-015-DGN
Chiltern Railways Linespeed Derogation for of Class 67 + Mk3 + DVT
13-105-DEV
GBRf Staff Charter – 27/07/2013. |