GIGN7616 Iss 2
Guidance on Interface between Station Platforms, Track and Trains
Synopsis
This document gives guidance on interpreting the requirements of Railway Group Standard GIRT7016 - Interface between Station Platforms, Track and Trains, relating to platform geometry and specifically supports Parts 2, 3, 4, 5, 6, 7, 8, 9 and 11. It does not constitute a recommended method of meeting any set of mandatory requirements. There is no guidance to support GIRT7016 Part 10 and Part 12. Guidance is also given on the Persons with Reduced Mobility (PRM) Technical Specification for Interoperability (TSI), the High Speed Infrastructure TSI (HS INF TSI) and the CR INF TSI relating to platform geometry).
Read full standard

Registered
Withdrawn
Guidance Note
- Issued:
- 01/03/2014
- Published:
- 01/03/2014
- In Force:
- 07/06/2014
- Withdrawn:
- 02/06/2018
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GIGN7616 Iss 1 |
Superseded By | RIS-7016-INS Iss 1, GIGN5633 Iss 1 |
Lead Committee | Infrastructure - INS |
Supporting Committee | Plant - PLT; Rolling Stock - RST; Traffic Operation and Management - TOM |
Briefing Notes | 14 BN01; 18 BN15 |
Impact Assessments
![]() Registered |
14 IA01; 18 IA17 |
Amendments
![]() Registered |
7616 Iss 2 AM001 |
Supporting Documents | GIRT7016 Iss 5 |