Menu

GIRT7073 Iss 1

Requirements for the Position of Infrastructure and for Defining and Maintaining Clearances

Synopsis

This document mandates requirements for positioning infrastructure, and maintaining the position of track relative to infrastructure to achieve gauge compatibility with rolling stock.

Summary Of Changes

Supersedes GCRT5212 Iss 1 to exclude requirements out of scope, replace lower sector structure gauge with lower sector infrastructure gauge, and to clarify requirements for new infrastructure, alterations to reduce stepping distances at platforms and cross-winds.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
05/12/2015
Published:
05/12/2015
In Force:
05/03/2016
Withdrawn:
01/09/2018

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GCRT5212 Iss 1
Superseded By GIRT7073 Iss 2
Lead Committee Infrastructure - INS
Supporting Committee Energy - ENE; Plant - PLT; Rolling Stock - RST
Briefing Notes 15 BN21; 18 BN15
Impact Assessments
register-icon
Registered
15 IA19; 18 IA17
Supporting Documents GEGN8573 Iss 4
Deviations
register-icon
Registered
16-121-DEV

Permanent use of Platform gap fillers (PGFs) on Heathrow Central Terminal Area and various platforms

16-122-DEV

New platform at Parkgate station - WME Down Up Parkgate Tram Transfer Line.

18-044-DEV

Goring Station Platform 4 (MLN1 44m 60c Up Relief).

18-058-DEV

Isolated Overhead Line Portal Mast number BG14/02

18-024-DEV

Exeter St. Davids Station Platform 5 Gauge Clearance and coper realignment