Menu

GKEHH004 Iss 3

Management of Wrong Side Failures

Synopsis

The aim of this document is to ensure that Wrong Side Failures (and potential Wrong Side Failures) are identified, investigated, reviewed and rigorously followed through to a satisfactory conclusion. Where appropriate the wrong side failures will be subject to a national overview. Although this document has been stamped superseded, it is not known by what.
Read full standard
register-icon
Registered
Withdrawn
Other
Issued:
01/05/1992
Published:
01/05/1992
In Force:
01/06/1992
Withdrawn:
31/12/1999

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GKEHH004 Iss 1
Lead Committee Control Command and Signalling - CCS