GKEHH004 Iss 3
Management of Wrong Side Failures
Synopsis
The aim of this document is to ensure that Wrong Side Failures (and potential Wrong Side Failures) are identified, investigated, reviewed and rigorously followed through to a satisfactory conclusion. Where appropriate the wrong side failures will be subject to a national overview.
Although this document has been stamped superseded, it is not known by what.
Read full standard

Registered
Withdrawn
Other
- Issued:
- 01/05/1992
- Published:
- 01/05/1992
- In Force:
- 01/06/1992
- Withdrawn:
- 31/12/1999
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GKEHH004 Iss 1 |
Lead Committee | Control Command and Signalling - CCS |