GKGN0612 Iss 1
Guidance on Signalling Lockout Systems to Protect Railway Undertaking Personnel
Synopsis
This document provides guidance on meeting the requirements of Railway Group Standard GKRT0212.
Summary Of Changes
Withdrawn. This Guidance Note supports the withdrawn GKRT0212 Iss 1. The content of this Guidance Note along with the Railway Group Standard has been included in full within RIS-0212-CCS Iss 1.
Read full standard
Registered
Withdrawn
Guidance Note
- Issued:
- 01/08/2007
- Published:
- 04/08/2007
- In Force:
- 06/10/2007
- Withdrawn:
- 01/12/2018
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Superseded By | RIS-0212-CCS Iss 1 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Plant - PLT; Traffic Operation and Management - TOM |
Briefing Notes | 07 BN18; 18 BN20 |
Impact Assessments
Registered |
18 IA22 |
Supporting Documents | GKRT0212 Iss 1 |