GKRT0010 Iss 1
Management of Signalling and Communications Systems
Synopsis
This document sets out the requirement that responsibility for control of signalling and communications systems is not divided between organisations in a manner which introduces risk to the railway.
Read full standard
Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/12/1995
- Published:
- 01/12/1995
- In Force:
- 01/12/1995
- Withdrawn:
- 03/02/2001
Details
| Consultation Status | Closed |
| Vehicle Assessment | No |
| Superseded By | GKRT0210 Iss 1 |
| Lead Committee | Control Command and Signalling - CCS |
| Briefing Notes | 01 BN03 |