Menu

GKRT0060 Iss 4

Interlocking Principles

Synopsis

This document mandates the principles of interlocking of signals, points and other parts of the signalling system so that the safe operation of trains is ensured.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/06/2003
Published:
07/06/2003
In Force:
02/08/2003
Withdrawn:
07/12/2013

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GKRT0060 Iss 3, SSP080 Iss 1, SSP057 Iss 1
Superseded By GKRT0055 Iss 1, GKRT0077 Iss 1
Lead Committee Control Command and Signalling - CCS
Supporting Committee Infrastructure - INS; Traffic Operation and Management - TOM
Briefing Notes 03 BN20; 13 BN18
Impact Assessments
register-icon
Registered
03 IA11; 13 IA09
Amendments
register-icon
Registered
0060 Iss 4 AM001
Deviations
register-icon
Registered
03-191-NC

Release of Route Locking

03-192-NC

Release of Route Locking

03-275-NC

Time of operation locking

04-211-NC

Control of distant signals

05-055-NC

Locking level controls

06-080-NC

Interlocking Principles

09-167-DGN

Application of Interlocking Principles (Movement Authority and Route Releasing) for Cambrian ERTMS Level 2.

09-107-DGN

Replacement of signals – application of historic standards at Reading

03-070-DGN

Setting and Locking of Routes

05-049-DGN

Control of lineside signal aspect

07-009-DGN

Interlocking principles

09-204-DGN

Non provision of signal group replacement facility.

08-061-DGN

Interlocking Principles (Tracker No 5357)

08-138-DGN

Interlocking Principles (Tracker 5501)

08-146-DGN

Interlocking Principles

08-153-DGN

Interlocking Principles (Tracker No 5566)

08-167-DGN

Interlocking Principles (Tracker No 5472)

09-074-DGN

Non provision of replacement control on GJ436 Signal, Greenhill Lower Junction without signaller’s replacement facility.

09-096-DGN

Detection of points in overlaps

09-109-DGN

Controls for shunt routes – reading Station area

View All