GKRT0064 Iss 1
Provision of Overlaps, Flank Protection and Trapping
Synopsis

- Issued:
- 01/12/2000
- Published:
- 02/12/2000
- In Force:
- 07/04/2001
- Withdrawn:
- 07/12/2013
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Superseded By | GKRT0055 Iss 1 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Infrastructure - INS; Traffic Operation and Management - TOM |
Briefing Notes | 01 BN09; 13 BN18 |
Impact Assessments
![]() Registered |
00 IA21; 13 IA09 |
Deviations
![]() Registered |
05-213-NC
Provision of overlaps - Flank protection and trapping
06-230-NC
Provision of overlaps - Flank protection and trapping
09-170-DGN
Provision of overlaps for Cambrian ERTMS Level 2.
09-215-TNC
Reduced Overlap on VS366 at Blackfriars.
05-059-DGN
Operation of a track circuit interrupter
05-114-DGN
Provision of Overlaps, Flank Protection and Trapping: Trap points.
06-120-DGN
Provision of Overlaps - Flank Protection and Trapping
06-218-DGN
Provision of overlaps - flank protection and trapping
07-001-DGN
Provision of overlaps - flank protection and trapping
07-151-DGN
Provision of Overlaps- Flank Protection and Trapping (Tracker No 4941)
09-015-DGN
Reminders for Track Points on S&C Renewals associated with The Up Goods Loop at Plumpton. (Tracker 6021)
09-108-DGN
Non implementation of Overrun Detection – Reading Station Area re-control.
00-172-DGN
Length of overlap based upon speed at 400m point
09-245-DGN
Reduced Overlaps in Thameslink Core Area
09-246-DGN
Reduced Overlaps in Blackfriars Area
06-246-TNC
Provision of overlaps - Flank protection and trapping
06-006-TNC
Provision of Overlaps - Flank Protection and Trapping
10-028-TNC
Reduced overlap on WH463 Luton during stageworks
03-322-TNC
Reduced Overlaps
10-146-TNC
Overlap on VS366 signal at Blackfriars |