GKRT0078 Iss 4
Platform Starting Signals
Synopsis
This document defines the method of risk assessment to be applied to platform starting signals and the special safety precautions to be provided for each category of risk. Added to Eddie 25.4.96, in Update 6(B).
Read full standard

Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/03/1996
- Published:
- 31/03/1996
- In Force:
- 31/03/1996
- Withdrawn:
- 06/06/1998
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Superseded By | GKRT0078 Iss 5 |
Lead Committee | Control Command and Signalling - CCS |