Menu

GKRT0105 Iss 1

The Transmission of Safety Related Information

Synopsis

Railtrack Work on Telecommunications Systems Carrying Control System Circuits Synopsis. This Standard sets out the policy for the management of work carried out on Telecomms systems which carry control system circuits with the aim of preventing any interference with those circuits which could lead to a Wrong Side Failure of the Signalling System.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/08/1994
Published:
23/08/1994
In Force:
23/08/1994
Withdrawn:
05/04/1997

Details

Consultation Status Closed
Vehicle Assessment No
Superseded By GKRT0105 Iss 2
Lead Committee Control Command and Signalling - CCS