Menu

GKRT0116 Iss 1

Assessment of Signalling Systems Before Design Alterations

Synopsis

This document sets out the requirements for assessing the condition of signalling systems where planning design alterations. This document will be transferred to Railtrack Line with effect from October 2000.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/06/1995
Published:
01/06/1995
In Force:
01/06/1995
Withdrawn:
01/10/2000

Details

Consultation Status Closed
Vehicle Assessment No
Lead Committee Control Command and Signalling - CCS
Briefing Notes 00 BN10