GKRT0191 Iss 1
Cable Laying from Rail Wagons/Mole Plough
Synopsis
The provisions of this standard apply to the planning and installation of Signalling and Telecommunications (S&T) cables and/or ducts by laying from rail wagons. This includes drum handling and direct burial by mole plough.
Document transferred to Railtrack Line.
Read full standard

Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/11/1995
- Published:
- 01/11/1995
- In Force:
- 01/02/1995
- Withdrawn:
- 31/12/1999
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Lead Committee | Control Command and Signalling - CCS |