GKRT0221 Iss 3
Signalling Works Testing
Synopsis
This document defines the requirements to ensure that new and altered signalling installations are independently tested in a manner which ensures their safe operation and compliance with design before they are placed into service. This standard is also contained within GKRH0730 - Signalling Testing Handbook.
Read full standard
Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/12/1997
- Published:
- 01/12/1997
- In Force:
- 04/04/1998
- Withdrawn:
- 07/04/2001
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GKRT0221 Iss 3 |
Superseded By | GKRT0209 Iss 1, GKRT0221 Iss 3 |
Lead Committee | Control Command and Signalling - CCS |
Briefing Notes | 01 BN11 |