Menu

GKRT0231 Iss 1

Signalling Maintenance Testing

Synopsis

This document defines the tests necessary to ensure the safe working of signalling installations after the like for like replacement of equipment; and the procedures covering the diversion of circuits, replacement of missing equipment and investigation of signalling failures.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/06/1994
Published:
01/06/1994
In Force:
01/06/1994
Withdrawn:
09/06/1997

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GKEHH203 Iss 1
Superseded By GKRT0231 Iss 2
Lead Committee Control Command and Signalling - CCS