GLRT1212 Iss 1
DC Conductor Rail Energy Subsystem and Interfaces to Rolling Stock Subsystem
Synopsis
This document defines the requirements for the DC conductor rail energy system and the interfaces to rolling stock operating over the DC electrified railway.
Summary Of Changes
12 mnth review - No further action required.
Optional reading and resources:
Read full standard
Registered
Withdrawn
Railway Group Standard
- Issued:
- 05/09/2015
- Published:
- 05/09/2015
- In Force:
- 05/12/2015
- Withdrawn:
- 07/03/2026
- Last Review:
- 05/09/2022
- Next Review:
- 01/12/2027
Details
| Consultation Status | Closed |
| Vehicle Assessment | No |
| Supersedes | GERT8025 Iss 1, GMRT1041 Iss 1, GLRT1254 Iss 1 |
| Superseded By | GLRT1212 Iss 2 |
| Lead Committee | Energy - ENE |
| Supporting Committee | Infrastructure - INS; Plant - PLT; Rolling Stock - RST |
| Briefing Notes | 15 BN14 |
|
Impact Assessments
Registered |
15 IA14 |
| Supporting Documents | GLGN1612 Iss 1 |