GMRT2000 Iss 1
Engineering Acceptance of Rail Vehicles
Synopsis
This document defines the engineering acceptance process to enable rail vehicles to be registered to operate on Railtrack controlled infrastructure.
Read full standard
![register-icon](/-/media/Themes/RSSB/RssbWebsite/Default/images/icons/register-icon.png)
Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/06/1995
- Published:
- 01/06/1995
- In Force:
- 06/08/1995
- Withdrawn:
- 02/12/2000
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GMRT2000 Iss 1 |
Superseded By | GMRT2000 Iss 2 |
Lead Committee | Rolling Stock - RST |