GMRT2043 Iss 2
Braking System and Performance for Freight Trains
Synopsis
This Standard defines the performance requirements of the braking systems of freight trains together with the principal features that shall be incorporated to enable safe operation and interworking to take place.
This document contains requirements that are amended under the Railway Group Standards Code (Issue Three) as a small scale change. Reference to the amended requirements is made in the 'Issue record'. All other parts of the document are unchanged from the previous issue.
Summary Of Changes
Superseded by GMRT2045 Iss 4
Read full standard

Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/06/2011
- Published:
- 04/06/2011
- In Force:
- 03/09/2011
- Withdrawn:
- 04/06/2016
Details
Consultation Status | Closed |
Vehicle Assessment | Yes |
Supersedes | GMRT2043 Iss 1 |
Superseded By | GMRT2045 Iss 4 |
Lead Committee | Rolling Stock - RST |
Supporting Committee | Plant - PLT |
Briefing Notes | 11 BN07; 16 BN02 |
Impact Assessments
![]() Registered |
11 IA04; 16 IA01 |