GMTT0107 Iss 1a
25kv A.C. Electrified Lines - Traction Bonding
Synopsis
This document is issued by the British Railways Board to define the Boards requirements for continuity on Railway systems. This will ensure a continuous return circuit and the currents in the return circuit do not interfere with the operation of signalling circuits or equipment. It will also allow paralleling of return circuits to reduce overall return resistance.
Read full standard

Registered
Withdrawn
Other
- Issued:
- 01/03/1994
- Published:
- 01/03/1994
- In Force:
- 01/03/1994
- Withdrawn:
- 01/08/1998
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Superseded By | GMRT1010 Iss 1 |
Lead Committee | Rolling Stock - RST |