GORT3437 Iss 6
Defective On-Train Equipment
Synopsis
This document mandates the requirements relating to the production of contingency plans, which have to be applied when on-train equipment becomes defective. It applies to all trains being brought into service, and to those in service, on Network Rail managed infrastructure.
This document contains requirements that are amended under the Railway Group Standards Code (Issue Three) as a small scale change. Reference to the amended requirement is made in the 'Issue Record'. All other parts of the document are unchanged from the previous issue.
Read full standard

Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/06/2010
- Published:
- 05/06/2010
- In Force:
- 04/09/2010
- Withdrawn:
- 07/12/2013
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GORT3437 Iss 5 |
Superseded By | GORT3437 Iss 7 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS; Plant - PLT; Rolling Stock - RST |
Briefing Notes | 10 BN11; 13 BN22 |
Impact Assessments
![]() Registered |
13 EOC05 |