RIS-0713-CCS Iss 1
Lineside Signalling Layout Driveability Assessment Requirements
Synopsis
This document sets out requirements for assessing the driveability of lineside signalling systems, and guidance on the process of assessing changes to signalling layouts or signal aspect sequences.
Summary Of Changes
The intent of RIS-0713-CCS Iss 1 is to provide industry with a wider understanding of the requirements necessary for assessing the driveability of lineside signalling systems, and guidance on the process of assessing changes to signalling layouts or signal aspect sequences. It also helps Transport Undertakings and Proposers assess whether a planned change to a lineside signalling layout, or the way it is used, is fit for purpose in supporting the train driving task by establishing the adequacy of the presentation of information, by the lineside signalling system, to train drivers.
Read full standard

Registered
Withdrawn
Rail Industry Standard
- Issued:
- 03/03/2018
- Published:
- 03/03/2018
- In Force:
- 03/03/2018
- Withdrawn:
- 13/03/2018
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GKRT0045 Iss 5, GKGN0645 Iss 5, GERT8071 Iss 2, GEGN8571 Iss 2 |
Superseded By | RIS-0713-CCS Iss 1.1 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Traffic Operation and Management - TOM |
Briefing Notes | 18 BN01 |
Impact Assessments
![]() Registered |
18 IA02 |