SSP003 01-61
Track Circuit Clearance Points
Synopsis
Track circuits are to be terminated at the first suitable rail joint beyond the clearance point.
Read full standard

Registered
Withdrawn
Other
- Issued:
- 01/01/1961
- Published:
- 27/10/2016
- In Force:
- 01/01/1961
- Withdrawn:
- 01/02/1972
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Superseded By | SSP036 02-72 |
Lead Committee | Control Command and Signalling - CCS |