Menu

SSP029 Iss 1

Indication to be Displayed for the Control of Trains during Loading or Unloading Operations

Synopsis

This has been amended to specify the requirements where the loading or unloading movements intrude into an area controlled by a BR signalbox or ground frame. Although this document has been stamped superseded, it is not known by what.
Read full standard
register-icon
Registered
Withdrawn
Other
Issued:
01/07/1991
Published:
01/07/1991
In Force:
01/08/1991
Withdrawn:
01/02/1996

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes SSP029 02-88
Superseded By GKRT0031 Iss 1
Lead Committee Control Command and Signalling - CCS