COP0034 Iss 3
Piling using OTP
Synopsis
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway infrastructure. This is provided in addition to any Mandatory requirements specified by the Infrastructure Manager. It applies to the piling activities covering competence groupings, piling driver vibratory, piling hammer, piling torque head, or auger driver when using OTP.
Summary Of Changes
Updates to Section 1 (Quick hitches and contingency plans), Section 3 (reference to Federation of Piling Specialists (FPS), adjacent services including former coal mines, DTH Hammers) and Section 5 (FPS and qualifications)
Live
M and EE Networking Group:
Code of Practice
- Issued:
- 07/06/2025
- Published:
- 07/06/2025
Details
Vehicle Assessment | No |
Supersedes | COP0034 Iss 2 |