COP0038 Iss 3
Code of Practice for Defective OTP Safety Critical Equipment
Synopsis
This Code of Practice details what actions should be undertake when On-Track Plant (OTP) is discovered to have defective safety critical equipment prior to, or during use on any UK Railway Infrastructure.
Summary Of Changes
In new M&EE format and changes to brakes, directional lighting, collision avoidance, telematics and isolation limit detectors.
Withdrawn
M and EE Networking Group:
Code of Practice
- Issued:
- 22/03/2023
- Published:
- 03/06/2023
- Withdrawn:
- 07/12/2024
Details
Vehicle Assessment | No |
Supersedes | COP0038 Iss 2 |
Superseded By | COP0038 Iss 4 |