Duties of the person in charge of the possession (PICOP)

Synopsis

You will need this handbook if you carry out the duties of the PICOP.

Summary Of Changes

Section 4.1, ‘Confirming the details with the signaller’, has been revised so that the person in charge of the possession (PICOP) is now required to contact each signaller who controls a protecting signal leading to the line under possession, and make all the necessary arrangements with each of those signallers.

A new requirement has been introduced to Section 4.2, ‘Taking possession around one or more engineering trains’ so that the PICOP is required to tell drivers that the possession has been granted before authorising them to move.

‘Back-to-back’ possessions are now permitted when the protection is placed in relation to points as well as signals, providing no movements will take place from one possession into another. The necessary instructions have now been included in section 4.3. A clarification has been added in the same section on back-to-back possessions that it is not necessary for detonator protection to be at the standard distance.

Obsolete references to safe work leader (SWL) have been removed throughout sections four, six, eight, eleven and twelve.

The changes form part of the suite of general updates issued annually which are intended to improve understanding and application of the content of the Rule Book and provide opportunities for duty holders to operate more efficiently. 


Read full standard
register-icon
Registered
Live
Rule Book Handbook
Issued:
07/09/2024
Published:
07/09/2024
In Force:
07/12/2024
Next Review:
07/12/2025

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GERT8000-HB11 Iss 10
Associated Standard GERT8000-RBBL Iss 40, GERT8000 Issue HB Iss 18
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Control Command and Signalling - CCS; Plant - PLT; Rolling Stock - RST
Impact Assessments
register-icon
Registered
24 IA13
Deviations
register-icon
Registered
24-022-DEV Revised 03-12-2024

The use of T3-A as a process for the protection of T3 possessions on Network Rail managed infrastructure

24-039-DEV

Local amendment to 23-021-DEV, "Work site X in T3 possessions using an Engineering Supervisor"

22-101-DEV Revised 05-12-2024

The use of signal disconnection as secondary protection for T3 possessions - National Deviation