GERT8000-SP Iss 7
Speeds
Synopsis
You will need this module if you carry out the duties of a driver, signaller or train preparer.
Summary Of Changes
The introduction of new acceleration indicators allows front of train acceleration for certain types of level crossing and for non-track-fault-related permissible speed restrictions. Clause 2.1 has been revised to include driver actions when a change in permissible speed is indicated by an acceleration indicator with an additional description and diagram SP.1 (b) in clause 3.2.
The changes form part of a suite of standards changes that are expected to generate significant operational benefits from a reduction in the effects of delays.
Optional reading and resources:
Read full standard

Registered
Live
Rule Book Modules:
Speed and restrictions (SP)
- Issued:
- 07/09/2024
- Published:
- 07/09/2024
- In Force:
- 07/12/2024
- Next Review:
- 07/12/2025
Details
Vehicle Assessment | No |
Supersedes | GERT8000-SP Iss 6 |
Associated Standard | GERT8000-RBBL Iss 40, GERT8000 Issue Iss 37 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS |
Impact Assessments
![]() Registered |
24 IA15 |