GERT8000-SP Iss 6
Speeds
Synopsis
You will need this module if you carry out the duties of a driver, signaller or train preparer.
Summary Of Changes
Section 2.2 has been revised to state that it applies to trains formed of any mark of coaching stock, and that none of the restrictions apply when train operating company instructions allow this, based on the class of locomotive or train formation concerned having sufficient brake power.
Optional reading and resources:
Read full standard

Registered
Withdrawn
Rule Book Modules:
Speed and restrictions (SP)
- Issued:
- 04/09/2021
- Published:
- 04/09/2021
- In Force:
- 04/12/2021
- Withdrawn:
- 07/12/2024
- Last Review:
- 23/07/2023
- Next Review:
- 03/12/2027
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-SP Iss 5 |
Superseded By | GERT8000-SP Iss 7 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS |
Impact Assessments
![]() Registered |
21 IA13 |
Supporting Documents | GERT8000-RBBL Iss 36 ; GERT8000-Issue Iss 33 |
Deviations
![]() Registered |
24-011-DEV
Class 90 ETCS Acceleration Trial
21-021-DEV
Trial of 'front of train clear speed' signs at Bristol Temple Meads Station.
19-023-DEV Revised 16/11/2023
Trials conducted at a number of passive level crossings agreed with Network Rail routes and train operators who operate over the lines concerned |