GERT8000-TS11 Iss 6
Failure of, or work on, signalling equipment - signallers' regulations
Synopsis
You will need this module if you carry out the duties of a signaller.
Summary Of Changes
Section 6.5 has been created with new instructions included concerning signalling work being carried out, the person in charge of which is not located within the limits of the possession.
Read full standard

Registered
Withdrawn
Rule Book Modules:
Train signalling (TS)
- Issued:
- 02/09/2023
- Published:
- 02/09/2023
- In Force:
- 02/12/2023
- Withdrawn:
- 07/12/2024
- Next Review:
- 02/12/2024
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-TS11 Iss 5.1 |
Superseded By | GERT8000-TS11 Iss 7 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Plant - PLT; Rolling Stock - RST; Control Command and Signalling - CCS |
Impact Assessments
![]() Registered |
23 IA14 |
Supporting Documents | GERT8000-RBBL Iss 39 |