Menu

Poster L3 Iss 3

Crane Controller Competence for Twin Jib Cranes

Synopsis

This poster is provided by the M&EE Networking Group to remind industry that when using a twin jib crane under the control of one operator then there is only the need for one Crane Controller. Where more than one TJC is used to lift a single load this is classified as multiple lifting. Additional training and competence for the operators and Crane Controllers is required.

Summary Of Changes

Updated Poster in new M&EE format.

Live
M and EE Networking Group: Poster
Issued:
26/10/2022
Published:
03/12/2022

Details

Vehicle Assessment No
Supersedes Poster L3 Iss 2