Poster L3 Iss 3
Crane Controller Competence for Twin Jib Cranes
Synopsis
This poster is provided by the M&EE Networking Group to remind industry that when using a twin jib crane under the control of one operator then there is only the need for one Crane Controller. Where more than one TJC is used to lift a single load this is classified as multiple lifting. Additional training and competence for the operators and Crane Controllers is required.
Summary Of Changes
Updated Poster in new M&EE format.
Live
M and EE Networking Group:
Poster
- Issued:
- 26/10/2022
- Published:
- 03/12/2022
Details
Vehicle Assessment | No |
Supersedes | Poster L3 Iss 2 |