
Registered
Case study: Reducing Whole Life Carbon
10/05/2019
Camden Town Station Capacity Upgrade (CTSCU) was chosen by TfL as a pilot scheme to demonstrate the principle of lowering infrastructure carbon leads to lower overall costs, could be implemented on a large-scale station upgrade within the constraints often encountered by London Underground infrastructure projects.