
Premium
RED 24 Safety on Track
This RED looks at the importance of following safety procedures. Two fitters are sent to assist a failed train but don’t speak to the signaller to arrange protection. When they arrive, they and the driver attempt to assess the damage from the six foot and again, do not arrange protection.