GCRT5021 Iss 4
Track System Requirements
Synopsis
Small Scale Change.
This document mandates requirements for track geometry, track system, track components and switches and crossings to provide for the safe guidance and support of rail vehicles.
Read full standard

Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/12/2009
- Published:
- 05/12/2009
- In Force:
- 06/02/2010
- Withdrawn:
- 03/03/2012
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GCRT5021 Iss 3 |
Superseded By | GCRT5021 Iss 5 |
Lead Committee | Infrastructure - INS |
Supporting Committee | Control Command and Signalling - CCS; Plant - PLT; Rolling Stock - RST |
Briefing Notes | 09 BN30; 11 BN24 |
Impact Assessments
![]() Registered |
09 IA12; 09 IA14; 11 IA16 |
Deviations
![]() Registered |
10-077-DGN
Departure Road from North Pole Depot
11-001-DGN
Existing freight siding near Gerrards Cross station on the NAJ2 line – Track Gradient
15-136-DEV
Windsor branch siding track gradient. |