Menu

GCRT5021 Iss 5

Track System Requirements

Synopsis

This document mandates requirements for track geometry, track system, track components and switches and crossings (S&C) to provide for the safe guidance and support of rail vehicles. This document contains 'open points', that is, requirements that have not yet been specified, but which are within scope of the document.
Read full standard
Registered
Live
Railway Group Standard
Issued:
01/12/2011
Published:
03/12/2011
In Force:
03/03/2012
Last Review:
01/03/2018

Details

Under Consultation Closed
Vehicle Assessment Yes
Supersedes GCRT5021 Iss 4
Lead Committee Infrastructure - INS
Supporting Committee Control Command and Signalling - CCS; Plant - PLT; Rolling Stock - RST
Briefing Notes 11 BN24
Impact Assessments
Registered
11 IA16
Amendments
Registered
5021 Iss 5 AM001; 5021 Iss 5 AM002
Supporting Documents GCRC5521 Iss 1
Deviations
Registered
12-179-TNC

Use of turn-back facility at Horsforth

12-184-DGN

Use of Turn-back facility at Horsforth – Track gradient.

15-034-DEV

Wembley Turnback Siding - gradient.

18-036-DEV

Speed restriction for track quality

18-074-DEV

Cricklewood Station to Cricklewood North Sidings

18-079-DEV

Non-compliant Vertical Gradients for Stabling within Existing Network Rail sidings at

18-079-DEV_Revised

Non-compliant Vertical Gradients for Stabling within Existing Network Rail sidings at

20-014-DEV

Westcombe Park - Charlton Renewal (Up), NKL Up Road 1100 - Limits of Check Rail 7m

X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm