Menu

GEGN8628 Iss 1

Guidance on Preparation for and Operation during Winter

Synopsis

This document gives guidance on the preparation of infrastructure and rolling stock for winter and their subsequent operation during frost, ice and snow conditions on the Great Britain (GB) mainline railway. This document has been structured into separate sections covering infrastructure, rolling stock and operations. When planning for winter, consideration should be given to all of the guidance in GEGN8628 as there could be information in one section of the document that is pertinent to other areas of the railway.
Read full standard
register-icon
Registered
Withdrawn
Guidance Note
Issued:
01/06/2013
Published:
01/06/2013
In Force:
01/06/2013
Withdrawn:
06/06/2020

Details

Consultation Status Closed
Vehicle Assessment Yes
Superseded By GEGN8628 Iss 2
Lead Committee Rolling Stock - RST
Supporting Committee Control Command and Signalling - CCS; Energy - ENE; Infrastructure - INS; Plant - PLT; Traffic Operation and Management - TOM
Briefing Notes 13 BN16