GERT8000-T3 Iss 7
Possession of a running line for engineering work
Synopsis
You will need this module if you carry out the duties of a driver or signaller. Information on changes to the issue can be found in the Rule Book Briefing Leaflet (GERT8000-RBBL Iss 29)
Summary Of Changes
The change relates to the incorporation of requirements concerning the use of train radio equipment whilst the train is moving.
Superseded by GERT8000-T3 Iss 8.
Read full standard

Registered
Withdrawn
Rule Book Modules:
Track and signalling work (T)
- Issued:
- 03/09/2016
- Published:
- 03/09/2016
- In Force:
- 03/12/2016
- Withdrawn:
- 02/12/2017
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-T3 Iss 6 |
Superseded By | GERT8000-T3 Iss 8 |
Lead Committee | Traffic Operation and Management - TOM |
Impact Assessments
![]() Registered |
16 IA10; 17 IA10 |
Amendments
![]() Registered |
8000-T3 Iss 7 AM001 |
Supporting Documents | GERT8000-RBBL Iss 29 |