Menu

GERT8000-T3 Iss 8

Possession of a running line for engineering work

Synopsis

You will need this module if you carry out the duties of a driver or signaller.

Summary Of Changes

The maximum speed in possessions reduced from 40 to 25 mph. Changes made to allow a possession to be given up around more than one train - previously published in PON.
Read full standard
register-icon
Registered
Withdrawn
Rule Book Modules: Track and signalling work (T)
Issued:
02/09/2017
Published:
02/09/2017
In Force:
02/12/2017
Withdrawn:
05/12/2020

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GERT8000-T3 Iss 7
Superseded By GERT8000-T3 Iss 9
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Plant - PLT
Impact Assessments
register-icon
Registered
17 IA10
Supporting Documents GERT8000-RBBL Iss 30
Deviations
register-icon
Registered
19-011-DEV

High Output starting to plan the use of FTAP as business as usual (BAU).

19-011-DEV_Revised_01-07-2020

Network Rail High Output Train: Flexible Train Arrival Point (FTAP).