GERT8000-T3 Iss 8
Possession of a running line for engineering work
Synopsis
You will need this module if you carry out the duties of a driver or signaller.
Summary Of Changes
The maximum speed in possessions reduced from 40 to 25 mph.
Changes made to allow a possession to be given up around more than one train - previously published in PON.
Read full standard

Registered
Withdrawn
Rule Book Modules:
Track and signalling work (T)
- Issued:
- 02/09/2017
- Published:
- 02/09/2017
- In Force:
- 02/12/2017
- Withdrawn:
- 05/12/2020
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-T3 Iss 7 |
Superseded By | GERT8000-T3 Iss 9 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Plant - PLT |
Impact Assessments
![]() Registered |
17 IA10 |
Supporting Documents | GERT8000-RBBL Iss 30 |
Deviations
![]() Registered |
19-011-DEV
High Output starting to plan the use of FTAP as business as usual (BAU).
19-011-DEV_Revised_01-07-2020
Network Rail High Output Train: Flexible Train Arrival Point (FTAP). |