Menu

GERT8000-T3 Iss 9

Possession of a running line for engineering work

Synopsis

You will need this module if you carry out the duties of a driver or signaller.

Summary Of Changes

Sections 2.2 and 9.7 have been revised to facilitate the introduction of the flexible train arrival point (FTAP) into the Rule Book. Section 9.8 has been revised to include arrangements for giving up a work site with an engineering train or on-track machine standing within it. The changes are intended to allow work to be undertaken for a greater proportion of the available time within a possession. A new section 10 has been added to facilitate the introduction of high output protection zones into the Rule Book. The introduction of high output protection zones into the Rule Book is intended to improve track worker safety by removing the need for possession support staff to go trackside to place standard possession protection, and to result in improved productivity on each occasion that a high output train is used
Read full standard
Registered
Live Pending Withdrawal
Rule Book Modules: Track and signalling work (T)
Issued:
05/09/2020
Published:
05/09/2020
In Force:
05/12/2020
Withdrawn:
04/12/2021
Next Review:
05/12/2021

Details

Under Consultation Open
Consultation Link Consultation Link
Vehicle Assessment No
Supersedes GERT8000-T3 Iss 8
Superseded By GERT8000-T3 Iss 10
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Plant - PLT
Impact Assessments
Registered
20 IA13
Supporting Documents GERT8000-Issue Iss 31 ; GERT8000-RBBL Iss 34
Deviations
Registered
20-051-DEV

Granting possessions.

21-024-DEV

Possession of a running line for engineering work

X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm