GERT8000-TS1 Iss 13
General signalling regulations
Synopsis
This module contains the general signalling regulations that are applicable to all signallers.
Summary Of Changes
13.2.3 changed to refer to two instances when it is possible to grant a line blockage with a train in the affected section. 13.2.4 amended to encourage use of additional protection whenever possible. 10.3 amended to align with changes to S5 section 1.1
Read full standard

Registered
Withdrawn
Rule Book Modules:
Train signalling (TS)
- Issued:
- 01/09/2018
- Published:
- 01/09/2018
- In Force:
- 01/12/2018
- Withdrawn:
- 05/12/2020
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-TS1 Iss 12.1 |
Superseded By | GERT8000-TS1 Iss 14 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS |
Impact Assessments
![]() Registered |
18 IA29 |
Supporting Documents | GERT8000-RBBL Iss 32 ; Form NR3180 Iss 12-18 |
Deviations
![]() Registered |
19-002-DEV
High Output starting to plan the use of Protection Zone (PZ) as
19-039-DEV
SWL / COSS / IWA continuation of trials - Crossing the line procedure
19-039-DEV Revised 22-08-2019
SWL / COSS / IWA continuation of trials - Crossing the line procedure
20-026-DEV
Use of ZKL 3000 RC TCODs associated with automatic signals
20-026-DEV Revised 12-07-2021
Use of ZKL 3000 RC TCODs associated with automatic signals |