GERT8000-TS1 Iss 13

General signalling regulations

Synopsis

This module contains the general signalling regulations that are applicable to all signallers.

Summary Of Changes

13.2.3 changed to refer to two instances when it is possible to grant a line blockage with a train in the affected section. 13.2.4 amended to encourage use of additional protection whenever possible. 10.3 amended to align with changes to S5 section 1.1
Read full standard
Registered
Live Pending Withdrawal
Rule Book Modules: Train signalling (TS)
Issued:
01/09/2018
Published:
01/09/2018
In Force:
01/12/2018
Withdrawn:
05/12/2020

Details

Under Consultation Closed
Vehicle Assessment No
Supersedes GERT8000-TS1 Iss 12.1
Superseded By GERT8000-TS1 Iss 14
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Control Command and Signalling - CCS
Impact Assessments
Registered
18 IA29
Supporting Documents GERT8000-RBBL Iss 32 ; Form NR3180 Iss 12-18
Deviations
Registered
19-002-DEV

High Output starting to plan the use of Protection Zone (PZ) as

19-039-DEV

SWL / COSS / IWA continuation of trials - Crossing the line procedure

19-039-DEV Revised 22-08-2019

SWL / COSS / IWA continuation of trials - Crossing the line procedure