Menu

GIRT7014 Iss 1

Infrastructure Requirements at Stations

Synopsis

The previously mandatory requirements contained in this document have either been transferred to GIRT7016 Interface between Station Platforms, Track and Trains issue 2 or have been replaced by the relevant sections of RIS-7700-INS Rail Industry Standard for Station Infrastructure.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/02/2004
Published:
07/02/2004
In Force:
03/04/2004
Withdrawn:
02/02/2008

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GCRT5164 Iss 1
Superseded By GIRT7016 Iss 2
Lead Committee Infrastructure - INS
Supporting Committee Control Command and Signalling - CCS; Traffic Operation and Management - TOM
Briefing Notes 08 BN02; 04 BN29
Amendments
register-icon
Registered
7014 Iss 1 AM001
Deviations
register-icon
Registered
04-246-DGN

Location of structures at terminal stations

05-030-DGN

Location of buildings and structures on platforms

05-182-DGN

Infrastructure Requirements at Stations

06-039-DGN

Infrastructure requirements at stations

06-054-DGN

Infrastructure Requirements at Stations

06-115-DGN

Infrastructure Requirement at stations

07-032-DGN

Construction of Lift Tower within 2500mm of platform edge at Newark Northgate Station

07-066-DGN

Infrastructure requirement: Chester - Platform 1 Bufferstop

07-068-DGN

Infrastructure requirements at stations

07-102-DGN

Infrastructure requirements at stations (Tracker No 4831)

07-145-DGN

Infrastructure Requirements at Stations (Tracker No 4966)

07-181-DGN

Infrastructure Requirements at Stations (Tracker No 5036)

06-114-DGN

Infrastructure Requirement at stations

07-072-TNC

Orpington: Infrastructure requirement at stations (Tracker No. 4498)

07-082-TNC

Infrastructure requirements at stations

07-083-TNC

Infrastructure Requirements at Stations

07-103-TNC

Infrastructure requirements at stations (Tracker No 4825)